COMMERCE
JAMB 2016 - Question 3
Commerce 2016 JAMB Past Questions - Question 3: The cost which is incurred as a result of failure to load or unload a ship at the ports within a specified period is referred to as
Choose the most appropriate option for the gap .
A:
B:
C:
D:
Correct Answer
A

