Commerce 2016 JAMB Past Questions - Question 3: The cost which is incurred as a result of failure to load or unload a ship at the ports within a specified period is referred to as

Choose the most appropriate option for the gap .
The cost which is incurred as a result of failure to load or unload a ship at the ports within a specified period is referred to as
A:
B:
C:
D:
Examkits App

Examkit's JAMB CBT App

Practice JAMB offline with our Online, PC and Mobile App

  • ✅ 25+ years of past questions (2000 to 2025)
  • ✅ Video solutions and explanation to questions
  • ✅ E-library
  • ✅ Study by topic
  • ✅ And more.

Correct Answer

A

Explanation